The basic requirement is to send data and images to our server from the airplane. We would like to send at least 10K jpegs every 5-15 minutes. This group deals with the development of hardware and software to do this.
| Task | Completion Date |
Description |
| Prelim system spec | 7/9/96 | functional description - operator interface (R/C & data paths) - electrical power spec - requirements on other systems - weight spec |
| Block diagram / layout | 7/16/96 | component breakdowns - dependencies on other systems - redundancy - data paths |
| Prelim component spec | 7/23/96 | |
| Component brand & model identification |
7/30/96 | identify vendors, cost, donation status, delivery |
| Baseline system spec | 8/15/96 | detailed functional description - detailed weight budget - detailed power budget - detailed dependencies on other systems |
| Component acquisition | 8/31/96 | component tests |
| Bench-top hardware assembly | 9/15/96 | |
| Flight software development | 10/30/96 | |
| Bench test | 11/15/96 | system tests, all flight modes - PC-driven simulation - operator interface |
| Documentation | 12/15/96 | operator interface - communication with other systems |
| Flight test | 3/31/97 | all flight modes - endurance test |
Onset Computers' Tattletale Model 7 with Ben Tigner's interface boards.
These will be specified soon.
Futaba servos
More detail here soon.